KERANGKA KONSEPTUAL RANTAI PASOK MATERIAL KONSTRUKSI JALAN DI PULAU TIMOR

Good road construction is influenced by several resources, one of which is material. Road construction materials include aggregates and asphalt. These materials are held by service providers, namely material suppliers. Material suppliers are importan...

View Full Research
ANALISIS KAPASITAS KEBUTUHAN LAHAN PARKIR DI MAKAM BUNG KARNO, KOTA BLITAR

The Bung Karno Tomb Area requires adequate parking facilities to accommodate two-wheeled, four-wheeled, dan six-wheeled vehicles. A viral case regarding a parking fee of up to IDR 800,000 for a group of buses at the Bung Karno Tomb Tourism dan Trade...

View Full Research
STUDI EKSPERIMENTAL PENGARUH PERUBAHAN NILAI KADAR AIR TANAH TERHADAP NILAI CBR (CALIFORNIA BEARING RATIO)

Soil water content significantly influences the bearing capacity of a soil. Bearing capacity is the ability of the soil to support construction loads. In a construction project, the subgrade must be able to support the planned loads and meet the requ...

View Full Research
PENINGKATAN KAPASITAS DAYA DUKUNG TANAH LEMPUNG DI CANGAR MELALUI STABILISASI DENGAN BATU KAPUR

Subgrade soil is a crucial component of any construction project, be it roads, buildings, or bridges. Maintaining soil stability, particularly soil reinforcement, requires special attention. The clay soil at the Cangar site is fertile and located in...

View Full Research
ANALISIS PERCEPATAN WAKTU TERHADAP BIAYA DENGAN METODE TIME COST TRADE OFF (Studi Kasus Proyek Pembangunan Gedung Islamic Center Kec. Rimbo Bujang Kab. Tebo Provinsi Jambi)

Cost and time are critical factors in construction projects. Therefore, it is essential to determine the optimal cost and time by performing Crashing on activities within the critical path. The analysis begins by identifying the critical path using t...

View Full Research
ANALISIS PERBANDINGAN BIAYA DAN WAKTU PELAKSANAAN BETON HALF SLAB DENGAN BETON KONVENSIONAL PADA PROYEK REVITALISASI MUSEUM MANDALA MATHIKA SUBAK

The construction implementation system in the Mandala Mathika Subak Museum Revitalization project uses the cast in situ or conventional method including floor slab work. The implementation of floor slab work with the cast in situ method requires a lo...

View Full Research
PERENCANAAN PELAKSANAAN PROYEK KONSTRUKSI KANTOR KPU KABUPATEN BADUNG

Construction project implementation planning is an important stage that aims to optimize time, cost, and quality of work. In the construction project of the Badung Regency KPU Office Building, implementation planning is very crucial considering the l...

View Full Research