Study on the utilization of wharf in supporting loading and unloading activities and mooring for fishing boats at fish landing base (ppi) klaligi, sorong city. Explore the utilization of Klaligi PPI wharf in Sorong for fishing boat loading/unloading and mooring. Research shows good condition & stakeholder satisfaction, but capacity issues exist.
The purpose of this research is to be able to describe the condition of the PPI Klaligi pier in Sorong City, to determine the level of stakeholder satisfaction in utilizing the PPI pier. The method used in street vendors is quantitative descriptive, namely through direct observation/observation, interviews, filling out questionnaires and literature study. Based on the research results, the condition of the PPI wharf is currently in good condition, the level of stakeholder satisfaction with jetty dock services and facilities is as follows: Loading and unloading: 73% of stakeholders are satisfied with the level of loading and unloading services at PPI Klaligi wharf. Mooring: 80% of stakeholders are satisfied with the level of mooring service at PPI. Physical condition: 73% of stakeholders are quite satisfied with the physical condition of the PPI pier. Capacity: 80% of stakeholders are dissatisfied with the capacity and size of the PPI Klaligi pier.
You need to be logged in to view the full text and Download file of this article - Study On The Utilization Of Wharf In Supporting Loading And Unloading Activities And Mooring For Fishing Boats At Fish Landing Base (PPI) Klaligi, Sorong City from INTEGRATED OF FISHERIES SCIENCE .
Login to View Full Text And DownloadYou need to be logged in to post a comment.
By Sciaria
By Sciaria
By Sciaria
By Sciaria
By Sciaria
By Sciaria